Van Ommeren Tank Terminal – Fujairah, UAE

Client: VOPAK Horizon Fujairah Limited
Vopak Horizon Fujairah Limited, established in 1998 serves the second largest fuel oil bunker market in the world. The storage capacity of the terminal is about 2.1 million cubic meters with 68 Tanks, 6 Jetties and 1 Single Point Mooring buoy. The terminal is equipped with facilities related to Nitrogen Generator for blanketing and pigging, Heating Facility and Blending & Additive Injection. Danway EME was involved in the complete Electrical and Instrumentation works associated with this facility during the Phase 1 of the project and subsequent expansion projects.

Taweelah – Unit III – UAN Water Transmission Scheme, UAE

Client: ADWEA / TRANSCO
This water transmission project involved construction of a new Unit III Pumping Station at Taweelah for which Danway EME performed the complete Design , Supply, Installation, Testing and Commissioning of 7nos. Variable Speed Pump & Motor sets, each with a capacity of 15.2 MIGD, Hypochlorination system, Hydraulic analysis, Surge protection, dedicated 33/11kV Substation, MEP and I&C works.

Paper Mill Project – Phase 1 & 2, UAE

Client: ADNIP, Abu Dhabi
Electrical, Mechanical and Instrumentation Works related to Tissue Paper Mill including Design, Supply and Installation of Effluent Water Treatment Facility Similarly for Phase 2, scope of works included Complete Mechanical, Electrical & Instrumentation Erection Works associated with 36,000 Ton/Yr Paper Mill and 80 Ton/Day De-Inking Plant.