Home | Companies | Danway E.M.E | Industrial | Contract Package 017661 – CE5457 Potlines 1 & 2, UAE

Project Title: Electrical and Instrumentation works for Potlines 1 and 2
Client: Emirates Aluminium Company Limited (EMAL)
Place: Abu Dhabi, United Arab Emirates
Scope of Work: The smelter complex covers a site of 6 sqkm and was built in two phases. Phase I was completed in early 2011, ahead of schedule. In 2011, EMAL commenced the Phase II expansion which was completed by the end of 2014. At the end of Phase II, EMAL will have the longest single potline in the world at 1.7 km and annual production capacity will almost double to 1.3 million metric tonnes. Danway EME has played a major role in the execution of Electrical and Instrumentation works associated with the Potlines, Carbon Plant, Casthouse, Material Handling and Power Distribution system in both the phases. During Phase 1 construction, Danway EME had a peak workforce strength of 1600 and achieved more than 4 Million manhours without LTI, validating its commitment to Health and Safety at work site.

DEWA 132kV/11kV Substations

DEWA 132kV/11kV Substations

Danway

Contract Package 017661 – CE5457 Potlines 1 & 2, UAE

Danway

Glass Bottle Project in Ras Al Khaimah, UAE

Danway

Rectifier Transformer Units and DC Busbar Works, UAE

Danway

Paper Mill Project – Phase 1 & 2, UAE

Back to Top