Project: Jebel Ali Power & Desalination Plant Station ‘K’ – Phase II
Client: Dubai Electricity and Water Authority / ENEL Power
Place: Dubai, United Arab Emirates
Scope of Work: Field Engineering, Supply, Construction of Electrical, Instrumentation and Control System Erection works for 850MW combined cycle power plant including 132kV / 1C x 2500mm2 Fibre Optic Integrated XLPE Cables and 1C x 1400mm2 XLPE Cables, Erection of 400kV GIS bays, 11kV Switchboards, Erection of 550MVA Interconnecting Transformers; 232MVA Generator Step-up Transformers; 70MVA Station Transformers and other associated electrical works. Instrumentation works included Installation, calibration of Field Instruments and Loop checking for Differential Pressure Transmitters, Differential Pressure Switches, Differential Pressure Gauges, Differential Pressure Indicators, Pressure Transmitters, Pressure Switches, Pressure Level Indicators, Flow Transmitters, Analyser Transmitters, Level Gauges, Level Transmitters, Level Indicators, Thermowells, DCS and Marshalling Panels etc.

DEWA 132kV/11kV Substations

DEWA 132kV/11kV Substations

DEWA 132kV/11kV Substations

DEWA 132kV/11kV Substations

DEWA 132kV/11kV Substations

Danway

AL- WAJH BSP Substation, Kingdom of Saudi Arabia

Danway

DEWA 132kV/11kV Substations

Danway

13MW Solar Power Plant at Bab Al Shams

Danway

Fujairah ‘F2’ Power Plant

Danway

33/11kV Substation at Al Ghadeer Development

Danway

Jebel Ali Power and Desalination Plant Station ‘K’ – Phase II

Danway

400kV Mussafah Substation

Back to Top