Jebel Ali Power and Desalination Plant Station ‘K’ – Phase II

Client: Dubai Electricity and Water Authority / ENEL Power
Field Engineering, Supply, Construction of Electrical, Instrumentation and Control System Erection works for 850MW combined cycle power plant including 132kV / 1C x 2500mm2 Fibre Optic Integrated XLPE Cables and 1C x 1400mm2 XLPE Cables, Erection of 400kV GIS bays, 11kV Switchboards, Erection of 550MVA Interconnecting Transformers….

Al Sufouh Transit System, UAE

Client: RTA / Alstom Transport
10Km of Line from Marina to Jumeirah Hills consisting of 12 Substations – 7 TPS (Traction Power Substation) and 5 LPS (Lighting and Power Substation); and a TPS Depot. TPS and LPS Equipment like High voltage switchboard (11kV), Transformer – Oil Traction Rectifier Transformer 1 MVA, Oil Auxiliary transformer (800 kVA), Rectifier Group, Traction Protection Board, Traction Distribution Board, Negative bar….

Upgrading Salam Street and Eastern Corniche, UAE

Client: Department of Municipal Affairs – ADM / Samsung-Saif Bin Darwish JV
One of Middle East’s longest road tunnels opened to motorists in December 2012 and is renamed as Zayed Street & Tunnel in remembrance of the founding father and architect of the U.A.E., the late Sheikh Zayed Bin Sultan Al Nahyan. The total length of the tunnel is 4.2 km with a 2.4 km enclosed section…