Al Sufouh Transit System, UAE

Client: RTA / Alstom Transport
10Km of Line from Marina to Jumeirah Hills consisting of 12 Substations – 7 TPS (Traction Power Substation) and 5 LPS (Lighting and Power Substation); and a TPS Depot. TPS and LPS Equipment like High voltage switchboard (11kV), Transformer – Oil Traction Rectifier Transformer 1 MVA, Oil Auxiliary transformer (800 kVA), Rectifier Group, Traction Protection Board, Traction Distribution Board, Negative bar….

Upgrading Salam Street and Eastern Corniche, UAE

Client: Department of Municipal Affairs – ADM / Samsung-Saif Bin Darwish JV
One of Middle East’s longest road tunnels opened to motorists in December 2012 and is renamed as Zayed Street & Tunnel in remembrance of the founding father and architect of the U.A.E., the late Sheikh Zayed Bin Sultan Al Nahyan. The total length of the tunnel is 4.2 km with a 2.4 km enclosed section…

Ras Al Akhdar and Baynoonah Street Upgrade (Package 1 & 2), UAE

Client: DOT / Al Naboodah National Contracting Group L.L.C
The project consisted of two tunnels, one of which spans 540 mtrs and the other tunnel spanning 700 mtrs. The scope includes Design, Engineering, Supply, Installation and commissioning of Tunnel and Street Lighting comprising LED fittings and HPSV fittings, Provision of street lighting and multifunctional poles….

Taweelah – Unit III – UAN Water Transmission Scheme, UAE

Client: ADWEA / TRANSCO
This water transmission project involved construction of a new Unit III Pumping Station at Taweelah for which Danway EME performed the complete Design , Supply, Installation, Testing and Commissioning of 7nos. Variable Speed Pump & Motor sets, each with a capacity of 15.2 MIGD, Hypochlorination system, Hydraulic analysis, Surge protection, dedicated 33/11kV Substation, MEP and I&C works.

Expansion of Abu Dhabi Int’l Air Port (SCADIA), UAE

Client: Abu Dhabi Airports Company (ADAC) / ANNC
The project comprises of Design, Supply, Installation, Testing and Commissioning of Airfield Ground Lighting System, Apron Flood Lighting System, Visual Docking Guidance System, CCTV Camera System, WiFi System and Power Supply Network for the Nine New Hardstands. the Scope Also Includes Integration of the Airfield Lighting Control Systems (ALCMS) through Provision of New Fibre Optic Cables and Connections.

Abu Hamour Area Pumping Station, Qatar

Client: Ministry of Municipal Affairs & Agriculture – Civil Engineering Dept.
Supply, install, test and commission 415V Vertical Centrifugal Pumps, all Station Pipework, penstocks, sluice valves and reflux valves, Surge Analysis and Surge suppression, Control, Ventilation equipment and Deodoriser Unit, Motor Control Centre and all associated cabling, HVAC, Lighting and Small Power for the Pumphouse and external works, etc.