Project Title: Fujairah ‘F2’ Electrical And Instrumentation Works For 2000MW Combined Cycle Power Plant
Client: Fujairah Asia Power Co / Alstom Switzerland
Place: Fujairah, United Arab Emirates
Scope of Work: The “Fujairah F2” Power and Desalination Plant is the largest newly constructed IWPP in the U.A.E. with 2000MW of net power capacity and 130 MIGD of net water capacity – the plant commenced commercial operation in January 2011. Danway EME was the leading Electrical & Instrumentation Contractor for Alstom in performing the complete E&I works associated with 6 nos. GT26B gas turbines with supplementary fired HRSGs.

DEWA 132kV/11kV Substations

DEWA 132kV/11kV Substations

DEWA 132kV/11kV Substations

DEWA 132kV/11kV Substations

Danway

AL- WAJH BSP Substation, Kingdom of Saudi Arabia

Danway

DEWA 132kV/11kV Substations

Danway

13MW Solar Power Plant at Bab Al Shams

Danway

Fujairah ‘F2’ Power Plant

Danway

33/11kV Substation at Al Ghadeer Development

Danway

Jebel Ali Power and Desalination Plant Station ‘K’ – Phase II

Danway

400kV Mussafah Substation

Back to Top