Danway Project - Jebel Ali Power and Desalination Plant Station K – Phase II.

Jebel Ali Power and Desalination Plant Station K – Phase II

General information

Client: Dubai Electricity and Water Authority / ENEL Power

Date: 2001 – 2005

Task: Jebel Ali Power & Desalination Plant Station ‘K’ – Phase II

Description

Field Engineering, Supply, Construction of Electrical, Instrumentation and Control System Erection works for 850MW combined cycle power plant including 132kV / 1C x 2500mm2 Fibre Optic Integrated XLPE Cables and 1C x 1400mm2 XLPE Cables, Erection of 400kV GIS bays, 11kV Switchboards, Erection of 550MVA Interconnecting Transformers; 232MVA Generator Step-up Transformers; 70MVA Station Transformers and other associated electrical works. Instrumentation works included Installation, calibration of Field Instruments and Loop checking for Differential Pressure Transmitters, Differential Pressure Switches, Differential Pressure Gauges, Differential Pressure Indicators, Pressure Transmitters, Pressure Switches, Pressure Level Indicators, Flow Transmitters, Analyser Transmitters, Level Gauges, Level Transmitters, Level Indicators, Thermowells, DCS and Marshalling Panels etc.