Project Title: Installation of Power Supply and TIS (Transport Information Solution) equipment, cable laying, termination & testing.
Client: >RTA / Alstom Transport
Place: Dubai, UAE
Scope of Work: 10Km of Line from Marina to Jumeirah Hills consisting of 12 Substations – 7 TPS (Traction Power Substation) and 5 LPS (Lighting and Power Substation); and a TPS Depot. TPS and LPS Equipment like High voltage switchboard (11kV), Transformer – Oil Traction Rectifier Transformer 1 MVA, Oil Auxiliary transformer (800 kVA), Rectifier Group, Traction Protection Board, Traction Distribution Board, Negative bar, Main LV Distribution board, Battery charger (110 VDC), Secured LV distribution board (110 VDC)
Automation – Emergency tripping system, Control cubicle and its associated IO racks, IO racks ( located in equipment’s ), Human Machine Interface and TIS equipment in low current room like Uninterruptable Power Supply (UPS) – Control Cabinets, Battery racks and Power Distribution cubicle (PDC), Optical Distribution Frame, Train Signaling – Axle counter cubicle, Smart I/O cubicle, Relay cubicle, Telecom cubicle, SDH cubicle, PSD SMIO cubicle, Unit Interface Signaling (UIS) : UIS 7 Box and UIS 4 Box, Cable frame, SER RTU BOX and Trackside TIS equipments such as Eurobalise, Axle Counter, AVLS Beacons, Route Request Loop, Priority Request Loop, Traffic Light Signals, Data Communication System Antennas, CCTV Camera, WIFI Base, etc.